Cost Breakdown
Name/Model: Patton Tank (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 65
Configuration: Tracked Combat Vehicle
============================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (238 pts) 12.0 x 25,000 300,000.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 365,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 400,000.00
Engine (Fusion) (5,000 x 260 x 65) / 75 (+) 1,126,666.67 = 1,526,666.67
Turret 1 x 5,000 (+) 5,000.00 = 1,531,666.67
------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,531,666.67
============================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Chaff Pod 2,000 (+) 2,000.00 = 52,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 62,000.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 69,500.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 77,000.00
Flamer (Vehicle) (Ammo 20) [Empty Bin] 0 (+) 0.00 = 77,000.00
Flamer (Vehicle) (Ammo 20) [Empty Bin] 0 (+) 0.00 = 77,000.00
MML 5 75,000 (+) 75,000.00 = 152,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 152,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 152,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 412,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 412,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 412,000.00
------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 412,000.00
============================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------
Structural Cost 1,531,666.67
Weapons and Equipment Cost (+) 412,000.00 = 1,943,666.67
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 3,207,050.00
------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,207,050.00
|