Cost Breakdown
Name/Model: Patton Tank (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 65
Configuration: Tracked Combat Vehicle
============================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (232 pts) 13.0 x 20,000 260,000.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 325,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 360,000.00
Engine (Fusion) (5,000 x 260 x 65) / 75 (+) 1,126,666.67 = 1,486,666.67
Turret 1 x 5,000 (+) 5,000.00 = 1,491,666.67
------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,491,666.67
============================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 60,000.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 67,500.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 75,000.00
Flamer (Vehicle) (Ammo 20) [Empty Bin] 0 (+) 0.00 = 75,000.00
Flamer (Vehicle) (Ammo 20) [Empty Bin] 0 (+) 0.00 = 75,000.00
MML 5 75,000 (+) 75,000.00 = 150,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 150,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 150,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 150,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 410,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 410,000.00
------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 410,000.00
============================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------
Structural Cost 1,491,666.67
Weapons and Equipment Cost (+) 410,000.00 = 1,901,666.67
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 3,137,750.00
------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,137,750.00
|