Cost Breakdown
Name/Model: LL Turret
Technology: Inner Sphere
Tonnage: 35
Configuration: Wheeled Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (56 pts) 3.5 x 10,000 35,000.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 70,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 90,000.00
Engine (XL) (20,000 x 15 x 35) / 75 (+) 140,000.00 = 230,000.00
Heat Sinks (Single) 14 x 2,000 (+) 28,000.00 = 258,000.00
Turret 1 x 5,000 (+) 5,000.00 = 263,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 263,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
ER Large Laser 200,000 (+) 200,000.00 = 400,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 400,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 263,000.00
Weapons and Equipment Cost (+) 400,000.00 = 663,000.00
Combat Vehicle Cost Multiplier 1 + (35 / 200) (*) 1.175 = 779,025.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 779,025.00
|