Cost Breakdown
Name/Model: Thumper Artillery Vehicle TAV-1
Technology: Inner Sphere
Tonnage: 60
Configuration: Wheeled Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Standard) (200 pts) 12.5 x 10,000 125,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 185,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 215,000.00
Engine (Fusion) (5,000 x 220 x 60) / 75 (+) 880,000.00 = 1,095,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 1,097,500.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 1,097,500.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Small Laser 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser 11,250 (+) 11,250.00 = 72,500.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 272,500.00
Machine Gun 5,000 (+) 5,000.00 = 277,500.00
Machine Gun 5,000 (+) 5,000.00 = 282,500.00
Machine Gun 5,000 (+) 5,000.00 = 287,500.00
Machine Gun 5,000 (+) 5,000.00 = 292,500.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 292,500.00
Thumper 187,500 (+) 187,500.00 = 480,000.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 480,000.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 480,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 480,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 1,097,500.00
Weapons and Equipment Cost (+) 480,000.00 = 1,577,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 200) (*) 1.3 = 2,050,750.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,050,750.00
|