Cost Breakdown
Name/Model: Partisan (LB 5-X)
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (98 pts) 5.5 x 20,000 110,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 190,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 230,000.00
Engine (Internal Combustion) (1,250 x 240 x 80) / 75 (+) 320,000.00 = 550,000.00
Turret 3.5 x 5,000 (+) 17,500.00 = 567,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 567,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
LB 5-X AC 250,000 250,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 500,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 750,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,000,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,005,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,005,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,005,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 567,500.00
Weapons and Equipment Cost (+) 1,005,000.00 = 1,572,500.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 2,830,500.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,830,500.00
|