Cost Breakdown
Name/Model: UrbanHunter Tank Destroyer UBH-2C
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Hover Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (69 pts) 3.5 x 25,000 87,500.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 137,500.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 162,500.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 262,500.00
Engine (Internal Combustion) (1,250 x 15 x 50) / 75 (+) 12,500.00 = 275,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 277,500.00
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 277,500.00
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Hyper-Assault Gauss 40 (C) 600,000 (+) 600,000.00 = 650,000.00
Hyper-Assault Gauss 40 (Ammo 3) [Empty Bin] (C) 0 (+) 0.00 = 650,000.00
Hyper-Assault Gauss 40 (Ammo 3) [Empty Bin] (C) 0 (+) 0.00 = 650,000.00
Hyper-Assault Gauss 40 (Ammo 3) [Empty Bin] (C) 0 (+) 0.00 = 650,000.00
Hyper-Assault Gauss 40 (Ammo 3) [Empty Bin] (C) 0 (+) 0.00 = 650,000.00
Machine Gun 5,000 (+) 5,000.00 = 655,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 655,000.00
Streak SRM 2 (C) 15,000 (+) 15,000.00 = 670,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] (C) 0 (+) 0.00 = 670,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 670,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 277,500.00
Weapons and Equipment Cost (+) 670,000.00 = 947,500.00
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 1,895,000.00
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,895,000.00
|