Cost Breakdown
Name/Model: Shen Long Heavy Tank SHN-LG2
Technology: Inner Sphere
Tonnage: 70
Configuration: Tracked Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (178 pts) 9.0 x 25,000 225,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 295,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 330,000.00
Engine (Light Fusion) (15,000 x 280 x 70) / 75 (+) 3,920,000.00 = 4,250,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 4,260,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 4,272,500.00
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,272,500.00
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Chaff Pod 2,000 (+) 2,000.00 = 52,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 59,500.00
Heavy Machine Gun (Ammo 50) [Empty Bin] 0 (+) 0.00 = 59,500.00
Heavy PPC 250,000 (+) 250,000.00 = 309,500.00
Light AC/5 150,000 (+) 150,000.00 = 459,500.00
Light AC/5 150,000 (+) 150,000.00 = 609,500.00
Light AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 609,500.00
Light AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 609,500.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 609,500.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 4,272,500.00
Weapons and Equipment Cost (+) 609,500.00 = 4,882,000.00
Combat Vehicle Cost Multiplier 1 + (70 / 100) (*) 1.7 = 8,299,400.00
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,299,400.00
|