Cost Breakdown
Name/Model: Command Plane CPMLN
Technology: Inner Sphere
Tonnage: 15
Configuration: WiGE Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (40 pts) 2.5 x 10,000 25,000.00
Internal Structure (Standard) 1.5 x 10,000 (+) 15,000.00 = 40,000.00
Control Components 1 x 10,000 (+) 10,000.00 = 50,000.00
Lift/Dive Equipment 1.5 x 20,000 (+) 30,000.00 = 80,000.00
Engine (Fuel Cell) (3,500 x 135 x 15) / 75 (+) 94,500.00 = 174,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 176,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 176,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Command Console 500,000 500,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 500,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 176,500.00
Weapons and Equipment Cost (+) 500,000.00 = 676,500.00
Combat Vehicle Cost Multiplier 1 + (15 / 25) (*) 1.6 = 1,082,400.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,082,400.00
|