Cost Breakdown
Name/Model: PPC Carrier SLDF
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (241 pts) 13.5 x 20,000 270,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 350,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 390,000.00
Engine (Fusion) (5,000 x 160 x 80) / 75 (+) 853,333.33 = 1,243,333.33
Heat Sinks (Single) 20 x 2,000 (+) 40,000.00 = 1,283,333.33
Turret 2.5 x 5,000 (+) 12,500.00 = 1,295,833.33
-------------------------------------------------------------------------------------------------------
Total Structural Cost 1,295,833.33
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Guardian ECM Suite 200,000 200,000.00
PPC 200,000 (+) 200,000.00 = 400,000.00
PPC 200,000 (+) 200,000.00 = 600,000.00
PPC 200,000 (+) 200,000.00 = 800,000.00
Searchlight, Mounted 2,000 (+) 2,000.00 = 802,000.00
Trailer Hitch 0 (+) 0.00 = 802,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 802,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 1,295,833.33
Weapons and Equipment Cost (+) 802,000.00 = 2,097,833.33
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 3,776,100.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,776,100.00
|