Cost Breakdown
Name/Model: Estevez II
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (320 pts) 16.5 x 25,000 412,500.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 492,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 532,500.00
Engine (Fuel Cell) (3,500 x 240 x 80) / 75 (+) 896,000.00 = 1,428,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,430,500.00
Turret 2.5 x 5,000 (+) 12,500.00 = 1,443,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,443,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 850,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 850,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 850,000.00
CASE 50,000 (+) 50,000.00 = 900,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,200,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Rotary AC/5 275,000 (+) 275,000.00 = 1,475,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,475,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,475,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,475,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,475,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,443,000.00
Weapons and Equipment Cost (+) 1,475,000.00 = 2,918,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 5,252,400.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,252,400.00
|