Cost Breakdown
Name/Model: Thor II
Technology: Inner Sphere
Tonnage: 80
Configuration: Wheeled Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (179 pts) 10.0 x 20,000 200,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 280,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 320,000.00
Engine (XL) (20,000 x 300 x 80) / 75 (+) 6,400,000.00 = 6,720,000.00
Turret 2 x 5,000 (+) 10,000.00 = 6,730,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,730,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
Machine Gun 5,000 (+) 5,000.00 = 455,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 455,000.00
PPC 200,000 (+) 200,000.00 = 655,000.00
SRM 4 (Ammo 25) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 655,000.00
SRM 4 w/ Artemis IV FCS 60,000 + 100,000 (+) 160,000.00 = 815,000.00
Thumper 187,500 (+) 187,500.00 = 1,002,500.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,002,500.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,002,500.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 6,730,000.00
Weapons and Equipment Cost (+) 1,002,500.00 = 7,732,500.00
Combat Vehicle Cost Multiplier 1 + (80 / 200) (*) 1.4 = 10,825,500.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 10,825,500.00
|