Cost Breakdown
Name/Model: Regulator Hovertank (Arrow IV)
Technology: Inner Sphere
Tonnage: 45
Configuration: Hover Combat Vehicle
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (89 pts) 5.0 x 20,000 100,000.00
Internal Structure (Standard) 4.5 x 10,000 (+) 45,000.00 = 145,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 170,000.00
Lift/Dive Equipment 4.5 x 20,000 (+) 90,000.00 = 260,000.00
Engine (Fusion) (5,000 x 170 x 45) / 75 (+) 510,000.00 = 770,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 777,500.00
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 777,500.00
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 450,000.00
=======================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost 777,500.00
Weapons and Equipment Cost (+) 450,000.00 = 1,227,500.00
Combat Vehicle Cost Multiplier 1 + (45 / 50) (*) 1.9 = 2,332,250.00
-----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,332,250.00
|