Cost Breakdown
Name/Model: Light Engineering Vehicle
Technology: Inner Sphere
Tonnage: 20
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (16 pts) 1.0 x 10,000 10,000.00
Internal Structure (Standard) 2.0 x 10,000 (+) 20,000.00 = 30,000.00
Control Components 1 x 10,000 (+) 10,000.00 = 40,000.00
Engine (Internal Combustion) (1,250 x 100 x 20) / 75 (+) 33,333.33 = 73,333.33
-------------------------------------------------------------------------------------------------------
Total Structural Cost 73,333.33
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Backhoe 50,000 50,000.00
Bulldozer 50,000 (+) 50,000.00 = 100,000.00
Lift Hoist 50,000 (+) 50,000.00 = 150,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 150,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 73,333.33
Weapons and Equipment Cost (+) 150,000.00 = 223,333.33
Combat Vehicle Cost Multiplier 1 + (20 / 100) (*) 1.2 = 268,000.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 268,000.00
|