Cost Breakdown
Name/Model: Cyrano Gunship SLDFr
Technology: Inner Sphere
Tonnage: 30
Configuration: VTOL Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (44 pts) 2.5 x 20,000 50,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 80,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 95,000.00
Rotors 3 x 40,000 (+) 120,000.00 = 215,000.00
Engine (XL) (20,000 x 220 x 30) / 75 (+) 1,760,000.00 = 1,975,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 1,979,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,979,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 200,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 200,000.00
Beagle Active Probe 200,000 (+) 200,000.00 = 400,000.00
ER Large Laser 200,000 (+) 200,000.00 = 600,000.00
TAG 50,000 (+) 50,000.00 = 650,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 650,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,979,000.00
Weapons and Equipment Cost (+) 650,000.00 = 2,629,000.00
Combat Vehicle Cost Multiplier 1 + (30 / 30) (*) 2 = 5,258,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,258,000.00
|